Split kernel::entry_flows into entry_movements and flows_of so the
reversal-mirror proof fits CI; prove runs the fast harnesses, prove-slow
the 8 slow ones (own job in scheduled CI), prove-all both. Laws in
verification.md renumbered 1-31 with a table of all 55 harnesses.

MCP docs checked against the 115 tools (about 60 fixes) with a test that
every tool is documented; rules.md cross-references fixed; bookspec
statuses and loader tightened; viewer notes wrap and accounts sort by
code; STATUS.md says P3 is built, cutover pending.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01T3gXMVt7XJPi6ens1or9Dj
This commit is contained in:
swaitsandClaude Opus 5.5 committed 2026-10-22 02:13:08 -06:00
1 parent 2c5b5a7171
commit 0495726001
49 files changed
+963 -292

No files matched your search

+100 -33
View File
@@ -1,6 +1,6 @@
# STATUS — 2026-10-20: "Served" P0, P1 and P2 live; P3 next
# STATUS — 2026-10-21: "Served" P0, P1 and P2 live; P3 built and landed, its cutover pending
## Now: Served (plan/served.md), P0, P1 and P2 live
## Now: Served (plan/served.md), P0, P1 and P2 live; P3 on main
The 2026-10-16 audit of the first company's books (62 verified findings,
20 engine defects) and the design discussion that followed produced
@@ -88,38 +88,105 @@ folder's `legacy/`. Agents connect with `wanderbooks connect`, the viewer is
books data. The before-check found defect 21 again (the IIF ignores
`as_of`).
**Open from P3's depreciation and schedules work (defects 22 and 9,
review 2026-10-20), for the P3 lead:** the viewer still recomputes a
long-life asset's whole schedule every frame (plan defect 22's note; R12
of its brief: slow, never wrong); a schedule month a run leaves for a
human (dated in a closed period, or reversed after it ended) stays
unposted with nothing to mark it booked by hand, so its schedule never
shows complete, and a schedule or an asset registered by mistake has no
way to stop (a reversed month comes due again); both want a design
(a schedule's postings are its plan's, re-derived on replay, so it can't
catch a month up as depreciation does). From review round 2: a reversal
dated before the entry it reverses is refused for depreciation runs and
schedule postings only (B-9: a correction comes after what it corrects);
every other entry still takes one, a general rule for the P3 lead to
settle; the bookspec examples cite ASC 606-10-25-23, which `sources/`
holds only through DART (vendor it with 25-31, 25-32 and 55-20); the
every-order search runs three commands deep in `just check`; four and
five ran clean by hand (`WB_ORDERS_DEPTH`, one and five minutes), six is
P12's. Seen in the same review, not P3's: `ledger-store`
`ops::tests::the_server_makes_the_folder_and_the_viewer_only_reads_it`
failed once in a whole-workspace run (`!viewer_open` after both holders
dropped) and passed alone and in six runs of the crate's tests; likely a
child a concurrent test forks (backup's git) holding the viewer lock's
descriptor until it execs.
**P3 (engine correctness): built and landed on `main`, the cutover
pending.** Every defect group of plan P3 is on `main` (`2c5b5a7`), each
built from its brief, reviewed until a round came back clean, and with
its regression tests written as bookspec examples (51 in
`bookspec/examples/`, every one checked by `cargo test`): the odd cent
(defect 17, D-10, D-38), the IIF in plain ASCII and the CPA package as of
one day (defects 7, 21, D-36), the cash flow statement by ASC 230's
direct method (defect 1, D-35, D-42), rename, one set of period defaults
and tax categories that warn or refuse (defects 15, 16, 8), party totals
by what moved the money (defects 14, 11, 24), dated 1099 decisions,
payment methods and the card exception (defects 23, 12, 18, D-40),
depreciation straight-line by days through the final month and daily
schedules (defects 22, 9, D-37), the format upgrade only with the owner's
go-ahead (D-39), and assets' posted and scheduled depreciation, their
bases and the K-1 on the tax basis (defect 13, D-41); then three review
commits: the seams between the pieces (one fictional year checked
across engine, viewer, tools and package; three defects found and
fixed), asset basis (schema 14, shipped migrations pinned by hash; the
tax K-1's net income always open), and data safety (three new journal
features, replay with P2's TIN detector, the P2 served-books fixture). Mutation waits for
P12 (D-33): each piece's targets are listed in `docs/testing.md`.
**Next:** P3 (engine correctness; designed: one brief per defect group,
each attacked by a reviewer, kept outside this public repo since they cite
the first company's figures; the owner's questions come one at a time as
each is built), then P4-P13 as planned. P11: one app for Windows, Mac and
Linux (D-24). P12: max testing again (D-33). P13: bookspec (D-34), a
formal, sourced accounting specification first, then its own formal
validation and a conformance harness for any engine; P3's regression
tests are its first examples.
**The P3 surface review (2026-10-21)** checked the agent's surface, the
docs and the whole proof run on `main` with all of P3: `just check`
clean; the tools' docs (`docs/mcp-interface.md`) corrected tool by tool
against the code (about 60 fixes: wrong parameter names, missing outputs
and refusals, the idempotent list, the handbook's section list,
`books.start`'s next steps, the CPA package's files) and a new test that
every tool is documented and every documented tool exists
(`every_tool_is_documented_and_every_documented_tool_exists`; 115 tools,
`books.access_log` was undocumented); B-rule cross-references fixed in
code and tests (eight wrong); bookspec's statuses made consistent (an
example whose figures follow an owner decision is CHOICE and cites it:
thirteen statuses changed, five more examples given the decision they
rest on), its README now saying exactly what the loader takes,
and the loader refusing a closed-list value spelled any other way. **`just
prove` could not finish in its 30-minute cap at four jobs** (a CI
runner's cores) on a heavily loaded laptop: 52 of 53 harnesses in, the
reversal mirror at three lines still running. It is split, nothing
dropped: that harness is proved in two halves (`kernel::entry_flows` is
now `entry_movements` then `flows_of`) plus end to end at two lines, and
`just prove` runs 47 harnesses and Lean (308 s at four jobs on a quiet
machine; 83 headline theorems, standard axioms only) while `just
prove-slow` runs the eight slowest, each under its own cap (467 s), and
CI runs both (`docs/verification.md`, "Running it"). The laws are numbered
1 to 31 with no gaps, every harness listed with its runtime. The viewer's
P3 pages were rendered on the demo books and looked at
(`~/.cache/wanderbooks/shots-p3-surface/`): the figures tie across
pages (the register, the asset, the balance sheet, the tax summary, the
1099 worksheet and the party agree to the cent); two faults fixed: a
report's notes were cut to one line (the fixed asset register's lost its
explanation of the tax columns; they wrap now), and the Accounts page
listed accounts in the order they were added, not by code.
**Before P3 is live (the lead):** the cutover on the first company's
books: reinstall from `main`, the format upgrade with the owner's go-ahead
(D-39), `books.verify`, the P3 change log adjudicated against the P2
goldens (cash flow, the odd cent's true-up, depreciation by days), the
books fully categorized and then `policy.require_tax_category = refuse`
(P3, "Settled in design"), and the D-40/D-41 records. The installed
server still lacks P3's tools (`books.add_instrument` and the rest) until
then.
**Still open after P3 (each for the phase named, or the lead):**
- The viewer recomputes a long-life asset's whole schedule every frame
(`ledger-gui` `pages/assets.rs` `schedule`, called from the asset
page's draw; defect 22's note: slow, never wrong).
- A schedule month a run leaves for a human (dated in a closed period, or
reversed after it ended) has nothing to mark it booked by hand, so its
schedule never shows complete; a schedule or an asset registered by
mistake has no way to stop. Both want a design.
- A reversal dated before what it reverses is refused for depreciation
runs and schedule postings only (B-9); every other entry still takes
one: a general rule to settle (P4's reversal as a draft is the natural
place).
- Sources not yet read or vendored (`docs/spec/README.md`, "Open"): ASC
606-10-25-23 (DART only), 25-31, 25-32, 55-20 (B-16); 230-10-45-15(f)
(B-14 rule 11); the ASC 250 paragraph B-15 rule 6 means; 606-10-55-39
(B-17); 105-10-05-1 to 05-3's current wording. Public domain but not
vendored: IRC §701 and §6225 (B-14 rule 5), Treas. Reg.
§1.704-1(b)(2)(iv)(d)(1) and (g)(3) (B-25, cited only). Several cited
pages in `sources/intuit-iif.md` carry no SHA-256, and
`irs-entity-classification.md` and `file-names.md` no Source, Retrieved
or SHA-256 lines; Unicode UAX #14 (B-34) has no source file; Rev. Proc.
98-25's excerpt (`irs-records.md`) carries no "§5.01" label.
- Eight tool descriptions are over 700 characters (listed in
`tool_descriptions_fit_700_characters`): shortened in P5.
- The every-order asset search runs three commands deep in `just check`
(four and five clean by hand, `WB_ORDERS_DEPTH`); six is P12's. The
`ledger-store` test
`ops::tests::the_server_makes_the_folder_and_the_viewer_only_reads_it`
failed once in a whole-workspace run (likely a forked git child holding
the viewer lock's descriptor); it passed in this review's runs.
**Next:** the P3 cutover, then P4-P13 as planned. P11: one app for
Windows, Mac and Linux (D-24). P12: max testing again (D-33). P13:
bookspec (D-34), a formal, sourced accounting specification first, then
its own formal validation and a conformance harness for any engine; P3's
regression tests are its first examples.
---