docs: land the 2026-10-26 plan review and the team hand-off (plan/HANDOFF.md, served.md section 8)

This commit is contained in:
swaits committed 2026-10-26 15:20:00 -06:00
1 parent c1f9001cfe
commit 1bfce9157a
12 files changed
+1601 -945

No files matched your search

+27 -2
View File
@@ -1,6 +1,31 @@
# STATUS — 2026-10-22: "Served" P0 to P3 live, with Projects
# STATUS — 2026-10-26: "Served" P0 to P3 and P4b S1-S3 live; the plan reworked for a team
## Now: the plan is a hand-off (plan/served.md §8.0); P4b S4 next
**2026-10-26: the plan was reviewed and rewritten for a team of engineers
working in parallel worktrees.** A nine-stage Elephant-Goldfish review
(`plan/review-2026-10-26/`, consolidated in
`consolidated_review_report.md`) found `plan/served.md` sound as a design
record and not executable as a hand-off: no remaining unit could be built
from the text alone, P7 contradicted D-28/D-29, P4 was never reconciled
with the P4b slices built after it, every code pointer was stale, and
nothing stated status, dependencies, file ownership or done criteria.
Section 8 of the plan is new: 8.0 (the status and dependency table, the
merge order, the shared files and allocated names, the eight-field unit
template, the recipes R-A to R-G, the journal-safety checklist, how to
work in a worktree), 8.1 (what landed, with As-built blocks for P4b
S1-S3), 8.2 (every remaining unit in merge order: U0a, U0b, U0c, P4b S4
to S7, P4, P5, P6, P7, P8, P9a, P10, P11a, P11b, P12, P13), 8.3 (the
corrected P4b reference design; the owner's answers numbered A-1 to
A-14), 8.4 (what is not scheduled, and why). Decisions D-47 to D-54 and
open questions Q-4 to Q-7 were added; superseded sentences in sections 1
to 7 and 9 are struck through with the decision that superseded them.
The hand-off prompt for the implementing team is `plan/HANDOFF.md`.
Nothing in the code changed. **Next: U0a and U0b (the pre-steps), then
P4b S4 with S5 and S7 beside it (8.0.2).** The first owner questions in
line are Q-5 (one upgrade after S7, or an earlier one after S4) and Q-4
(the release manifest, before P11a's signing step).
## Now: Served (plan/served.md), P0 to P3 live; P4 next
The 2026-10-16 audit of the first company's books (62 verified findings,
20 engine defects) and the design discussion that followed produced