docs(plan): P11b and P13 step 6 landed; D-65 amended (Gitea only); the night's status

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01HS8WZziDnyxunC23MUxrLp
This commit is contained in:
swaitsandClaude Fable 5.1 committed 2026-10-29 17:11:37 -06:00
1 parent f625848acb
commit 2774680d65
3 files changed
+23 -5

No files matched your search

+19 -1
View File
@@ -1,6 +1,24 @@
# STATUS — 2026-10-28: nine units landed, five built on paused branches; P11a starts
## Now (2026-10-29, evening): wave 1 of the rest of the plan is landing
## Now (2026-10-29, night): waves 1 to 3 landed; P11c and P12 left
**Landed today**, each merged with a compile and the unit's own tests
(D-60) and gated by GitHub's `check` on the push: U0d, U0e, S4.5, P4,
P5, P6 (from the paused wave), P8, P10's runbook, P11a steps 0-4 and
the unsigned macOS bundle job, P11b, P13 steps 4-6. The plan's units
still open: **P11c** (the native Windows port; its branch compiles and
runs the suite on windows-latest, two lock-semantics failures fixed,
macOS still refuses to start the server in CI and the next run prints
why), **P11a** steps 5-7 (signing deferred by D-64; the in-app accept
and the viewer's update notice need names; the Mac trial is the
owner's), **P12** (max testing, after P11c), and P10's re-audit itself
(the owner's run). Decisions today: D-60 to D-65.
**The CI state** is the measure of the day: `main` must be green on
`check`; the portable macOS and Windows jobs are the two ports' gates
and red until they land. Every push is watched; a docs-only push is
never made alone (it cancels the running gate).
**Who builds.** The owner chose (the question tool) that this planning
session is the EM and launches Sonnet subagents in parallel worktrees,