docs(plan): P10 landed, P11a through step 4 and the macOS job; D-64 (signing deferred), D-65 (bookspec public repository)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01HS8WZziDnyxunC23MUxrLp
This commit is contained in:
1 parent
6f948592f6
commit
794807ab90
1 file changed
+6
-4
+6
-4
@@ -678,7 +678,7 @@ The `WANDERBOOKS_TOML` template (`ledger-cli/src/main.rs:237-347`) becomes the e
|
||||
| P4 | `list_drafts`. Leftover drafts are discarded or set to `awaiting_evidence`. | landed 2026-10-29 (`b97234ac`; schema 19; `Store::post_entry` itself is not gated, the server's `post_entry_checked` is: see the As-built block)
|
||||
| P6 | • `consolidate_duplicates` resolves the 11 redundant records (preview first).<br>• Extraction is backfilled for all 66 attachments.<br>• Receipt numbers 1000–1029 are annotated from the "Receipt ID" in each description. Anomalies become annotations: 1009 unissued; 1011/1020 byte-identical pairs (merged); 43/45/47 have no ID. The next number is derived as 1030.<br>• Instruments: Quillmere, joint Amex, member cards, Chase Ink 2050.<br>~~• `verify-sheet.py`'s tables become a `mapping` convention, then `compare_reference` runs against attachment 37 as of 2026-10-11.<br>• `drive-manifest.json` text goes to `record_inventory`; the Drive connector listing goes to `check_inventory`.~~ → not built (8.4): the final `verify-sheet` run is a filed workpaper (P2 pre-cutover) and P10 cites it. | Every attachment's `get_receipt` default answer under 8 KiB; the 11 duplicates consolidated; receipt numbers annotated |
|
||||
| ~~P7~~ | ~~`wanderbooks vault init` … `keys/legacy.key` shredded~~ → D-48: nothing; the v1 key stays in the books and in every backup (D-31) | — |
|
||||
| P10 | Re-audit (8.2 P10; `docs/runbooks/re-audit.md`). | the exit criteria there |
|
||||
| P10 | Re-audit (8.2 P10; `docs/runbooks/re-audit.md`). | the engineering deliverable landed 2026-10-29 (`docs/runbooks/re-audit.md`, the defect regression table); the re-audit itself is the owner's run
|
||||
|
||||
---
|
||||
|
||||
@@ -834,11 +834,11 @@ One row per unit of work. A unit is what one engineer takes into one git worktre
|
||||
| P9b | claude.ai through an external identity provider (D-7 b, Q-6) | not planned until Q-6 is answered | P9a | | | |
|
||||
| P9c | Remote viewer replica, invitations | not planned (D-51) | | | | |
|
||||
| P10 | The re-audit runbook and its CI mirror; the owner runs the re-audit | not started | P5, P6, P8 | P11a, P13 | none | 1 (+ owner days) |
|
||||
| P11a | Packaging and updates: step 0 the platform groundwork, the trial, `wanderbooks update`/`rollback`, Linux packages, signing, macOS and Windows bundles | in progress: step 0 (the portable CI job) and steps 1 (Linux), 2, 3 landed 2026-10-29 (`5e220cca`, `54312b39`: update/rollback, the Linux packages and repositories, the AppImage); steps 4-7 open; Q-4 before step 5; an open AppImage keeps running the old image until the books reopen (next step) | none (code); certificates and keys from the owner for the signing steps; Q-4 before the manifest step | everything | none | 20-25 |
|
||||
| P11a | Packaging and updates: step 0 the platform groundwork, the trial, `wanderbooks update`/`rollback`, Linux packages, signing, macOS and Windows bundles | in progress: steps 0-4 and the macOS half of step 6 landed 2026-10-29 (update/rollback, Linux packages, AppImage with restart, the daily staged update, the unsigned `.dmg` job); step 5 (signing) deferred by D-64; left: the in-app accept and the viewer's update notice (names needed), the release workflow's first run (owner's click), the trials on a Mac | none (code); certificates and keys from the owner for the signing steps; Q-4 before the manifest step | everything | none | 20-25 |
|
||||
| P11b | The agent dock and books homes | not started | P11a (an installed app to dock into) | P12 | none | 8-10 |
|
||||
| P11c | The native Windows port: named pipes with the SID check, owner-only DACLs, file locking, the `%LOCALAPPDATA%` data root, the Windows CI job made gating (D-62) | in progress (wave 2, branch `P11c`) | U0e; P11a step 0 (the portable job) | P11b, P12 | none | 5-8 |
|
||||
| P12 | Max testing, again | not started | everything else merged | | none | 2-3 (+ machine time) |
|
||||
| P13 | bookspec: checker crate, `Engine` trait, rule ids, the spec text, the runner | in progress: steps 1-3 landed 2026-10-26 (`579d0eed`); steps 4-5 landed 2026-10-29 (`d839e709`; ten stated rules have no example yet because the schema has no event or query for them, listed in the As-built block); step 6 (the spec's own public repository) is the owner's call | none for steps 1-4; the engine stable for step 5 | everything | none | 15-20 |
|
||||
| P13 | bookspec: checker crate, `Engine` trait, rule ids, the spec text, the runner | in progress: steps 1-5 landed (`579d0eed`, `d839e709`); step 6 (the spec's own public repository) decided 2026-10-29 (D-65): split out now | none for steps 1-4; the engine stable for step 5 | everything | none | 15-20 |
|
||||
|
||||
#### 8.0.2 Dependency graph and merge order
|
||||
|
||||
@@ -2182,6 +2182,8 @@ The owner decisions of 2026-10-16 (at the top of this document) replace the form
|
||||
| D-61 | Q-9 answered (owner, 2026-10-29, the question tool: "Split the reader out later") | **The reader (`extract.rs`) moves into a small library crate of its own, `ledger-reader`, that `ledger-store` and `ledger-import` both depend on; a half-day unit (U0d) for the implementing team after S4.5.** Until then the arrow stands as built; `ledger-import` never depends on `ledger-store`. | U0d; `docs/architecture.md` |
|
||||
| D-62 | Native Windows (owner, 2026-10-29, the question tool, after P11a step 0 found the Windows side is a port, not cfg fixes: "macOS first, Windows port as its own unit") | **The first bundled app ships for macOS and Linux; the native Windows port is unit P11c**, built after U0e beside P11b; Windows stays WSL2-only meanwhile and the `portable (windows-latest)` job is allowed to fail until P11c lands. D-56's destination is unchanged, only its order. | P11a, P11b, P11c |
|
||||
| D-63 | Where agents' tokens live (owner, 2026-10-29, the question tool, on seeing P11a step 0 add Keychain and Credential Manager stores: "why are you talking about the OS keyring? I thought we made a decision to not use that garbage"; the plan had no such decision recorded, so this one records it) | **A 0600 file under the 0700 data root, on every OS; no OS keyring.** The data root is the trust boundary already (I-1: hidden, not locked, same user), so the keyring added no wall and cost headless servers a D-Bus session, CI a knob, and every OS its own store. Unit U0e removes the Secret Service, Keychain and Credential Manager stores and the `file_keyring` knob; 3.3's sentence is struck. | U0e, P9a's recipe, P11a, P11c |
|
||||
| D-64 | Q-4 answered (owner, 2026-10-29, the question tool: "Defer: ship unsigned builds to yourself first") | **P11a step 5 (the signed release list, the key ceremony, Apple and Microsoft code signing) is deferred until the first public release is near.** CI builds unsigned artifacts for the owner's own machines; `wanderbooks update` works from a local feed meanwhile (no compiled-in key). The two-key design of D-25 is unchanged, only its date. | P11a step 5, `release.yml` |
|
||||
| D-65 | P13 step 6 (owner, 2026-10-29, the question tool: "Split it out now") | **The bookspec specification gets a public repository of its own now**, with this repository depending on it; the ten stated rules without examples and the three reserved numbers are published as such. | P13 step 6 |
|
||||
|
||||
### 10.2 Deferred
|
||||
|
||||
@@ -2192,7 +2194,7 @@ The owner decisions of 2026-10-16 (at the top of this document) replace the form
|
||||
|
||||
**Open (2026-10-29): Q-4, Q-6, Q-7, each when its unit starts.** One at a time, in plain English; none blocks the units before it. Q-5, Q-8 and Q-9 were answered (D-57, D-58, D-61) and are kept below for the record. Q-5 and Q-8 were answered on 2026-10-28 (D-57, D-58) and are kept below for the record.
|
||||
|
||||
**Q-4 (before P11a step 5).** Releases: should the app check updates against our own signed release list as well (two keys, one on your hardware token and one offline, a version that only goes up, an expiry), as decided on 2026-10-18 (D-25), or is the packaging tool's own single-key signature plus Apple's and Microsoft's code signing enough? The second is simpler and already refuses an older version; the first also stops a frozen or replayed update list. Recommended: the first, as decided, since the key work is small once the token exists.
|
||||
**Q-4 (closed 2026-10-29 → D-64: deferred; unsigned builds first).** Releases: should the app check updates against our own signed release list as well (two keys, one on your hardware token and one offline, a version that only goes up, an expiry), as decided on 2026-10-18 (D-25), or is the packaging tool's own single-key signature plus Apple's and Microsoft's code signing enough? The second is simpler and already refuses an older version; the first also stops a frozen or replayed update list. Recommended: the first, as decided, since the key work is small once the token exists.
|
||||
|
||||
**Q-5 (closed 2026-10-28 → D-57: once, after everything).** The receivables and payables work needs one more go-ahead to switch your books to the new format (numbers, terms, line accounts, sent records, discounts, write-offs). Should we ask once, after everything is built (write-offs and discounts included), or earlier, after invoice numbers and terms land, with a second ask later? Recommended: once, after everything, unless you need numbered invoices sooner.
|
||||
|
||||
|
||||