The planning session read plan/served.md, every design document and the
five branches the owner paused on 2026-10-27 against main (44ee4083),
with dry-run merges touching no branch. plan/2026-10-28_DRIFT_REPORT.md
lists every divergence and judges every recorded departure (all kept;
three owed back; one needs a decision: P6 made ledger-store depend on
ledger-import).

The plan: section 0 "What changed on 2026-10-28"; 8.0.1 and the unit
Status lines name S4.4, S5, S6, S7 and P6 as built but unmerged; 8.0.2
records the destination (D-56: the installed app, P11a starts now) and
the resume order with the known conflicts (the shared documents.rs
test file, the types.rs appends, P6 retaking schema 18, the law numbers
34 to 37); 8.0.3 lists the names the EM approved during the wave; P11a
gains step 0 (the macOS and Windows keyring stores, the Windows data
root and pipes, a cross-platform CI build: today the agent path runs on
Linux alone); Q-5 is due and Q-8 asks whether D-47 to D-54 stand; the
Landlock sentences in section 2 and server.toml are struck.

STATUS.md and HANDOFF.md say where things stand and how to resume;
roadmap.md and gui.md are rewritten to today. The docs lose their
stale facts: 122 tools, 2,700 tests, the parity floor at 21 with the
P4b notes the slices never wrote, the ten crates and their dependency
graph (jiff added to the core's allowed list), the cutover of
2026-10-20 recorded in capability-parity.md and parallel-run.md, the
P4b S1 law and its two Kani harnesses added to verification.md (law
34), the proof counts (51 and 9), and README, the site and install.sh
honest about macOS (the viewer runs; connecting an agent waits for
P11a's keyring store, and the installer now says so instead of failing).

just check on main at 44ee4083: exit 0 (167 suites, 2,871 passed, 0
failed, 7 ignored, the server-only build clean). No code changed.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01HS8WZziDnyxunC23MUxrLp
This commit is contained in:
swaitsandClaude Fable 5.1 committed 2026-10-28 18:26:23 -06:00
1 parent 44ee408312
commit af553a3706
21 files changed
+662 -220

No files matched your search

+71 -2
View File
@@ -1,6 +1,75 @@
# STATUS — 2026-10-26: "Served" P0 to P3 and P4b S1-S3 live; the plan reworked for a team
# STATUS — 2026-10-28: nine units landed, five built on paused branches; P11a starts
## Now: the plan is a hand-off (plan/served.md §8.0); P4b S4 next
## Now (2026-10-28): land the paused wave, then S4.5; start P11a beside it
**Where things stand.** `main` is `44ee4083`. Since the hand-off of
2026-10-26, nine units landed in two days: U0c (`198aa2a1`), P7
(`3e65c83f`), P13 steps 1-3 (`579d0eed`), P4b S4.1 (`13282cf8`), S4.2
(`bf91c5a7`), U0a (`45396bdc`), U0b (`26d3a994`), P9a (`c8541ea9`) and
S4.3 (`d19fb464`); the owner made D-55 (the party contact block). Five
more units are built to their Done-when lists on branches the owner
paused on 2026-10-27 to free the machine, none merged: S4.4 (`002fb9f8`),
S5 (`ad649be3`), S6 (`6c4480cd`), S7 (`4b4fecb9`), and P6 checkpointed as
`ce366408` (feature complete, its gate interrupted, "not for merge" as
is). Not started: S4.5, P4, P5, P8, P10, P11a, P11b, P12, P13 steps 4-6.
The live books are unchanged since the P3 cutover and the
`document_standing` upgrade of 2026-10-24; `documents_v2` waits for Q-5.
**The 2026-10-28 review.** The planning session read the whole plan and
every design document against `main`, the five branches and dry-run
merges; the result is `plan/2026-10-28_DRIFT_REPORT.md`, and the plan
and docs were brought up to date in the same change (served.md section
0, "What changed on 2026-10-28"). The gate on `main` at `44ee4083`:
green (`exit 0`, 70 minutes on a loaded machine: fmt, clippy and
rustdoc for both workspaces, 167 test suites, 2,871 tests passed, 0
failed, 7 ignored, the server-only build with no window libraries).
The five branches' gates are being re-run in their worktrees, one at a
time, and each is recorded in 8.0.1 when it lands.
**What the review judged.** Every departure the workers recorded was
reasonable and is kept (the drift report lists them with the reason);
three are owed back (S4.3's missing journal transaction across a
multi-line command; S6's `confirmed`, deferred to P4's sweep; S6's
three bookspec examples); one needs a decision (P6 made `ledger-store`
depend on `ledger-import` so the writer can extract at attach time).
No golden moved, no kernel arithmetic left `kernel.rs`, no unit touched
the owner's books.
**The merge hazards the pause left** (dry-run merges, nothing touched):
every P4b branch created `crates/ledger-cli/tests/documents.rs` from
8.0.3's one allocated file (add/add on every merge after the first);
`types.rs` appends collide; P6 branched before S4.3 and took schema 16,
which S4.3 holds (S5 took 17), so P6 retakes 18; S5 and S6 both numbered
their law 34 in `docs/verification.md` (S1's documents law is now 34 on
`main`; S5 becomes 35, S6 36, S7's write-off 37). The order and the
resolutions are in served.md 8.0.2, "Resuming the paused wave".
**The destination (D-56).** The owner, 2026-10-28: the work is
"ultimately taking it to a single bundled server+GUI installation for
Mac/Windows/Linux and then beyond". The installed app (P11a, then P11b)
is the plan's destination and the hosted service (served.md section 11)
what follows. Today the executable is Linux-first: tokens live in the OS
keyring and only the Linux Secret Service store exists, so on macOS
`wanderbooks connect` and the agent bridge fail (`tokens.rs`,
`NOT_YET`), Windows is WSL2 only, and no macOS or Windows build runs in
CI. P11a gains step 0 for exactly that groundwork and starts now, beside
the P4b finish; the P10 chain (P4, P5, P8) keeps its order.
**Next, in order:** (1) resume the five branches in the 8.0.2 order,
each rebased and `just check`ed again (the pause killed every gate),
P6 last with its gate run to the end and its dependency reviewed; (2)
ask the owner Q-5 and Q-8 when S4.4 lands; (3) S4.5; (4) P11a step 0
and the packaging trial, staffed now; (5) P4 (adding `confirmed` to the
settlement tools too), P5, P8, P10; P13 steps 4-6 beside; P11b after
P11a; P12 last.
**Housekeeping found:** about 1 TB of `target/` directories across the
six checkouts (1.7 TB free); 27 registered jj workspaces whose folders
are gone (`jj workspace forget`); branch `rescue/p4-invproj-20261026`
holds nothing `main` lacks (its bookspec example landed) and can go
after a last look.
## 2026-10-26 to 2026-10-27: the hand-off and its first wave
**2026-10-26: the plan was reviewed and rewritten for a team of engineers
working in parallel worktrees.** A nine-stage Elephant-Goldfish review