docs: the paused wave has landed; D-60, how much checking a merge gets; Q-9
The plan and the status documents say what is true after the merges of 2026-10-29: served.md section 0, the 8.0.1 rows and unit Status lines for S4.4, S5, S6, S7 and P6 (landed, with commits), the 8.0.2 resume paragraph turned into the record of what the merges found, P6's At-merge bullet (the write-off and dedup interaction, the five tests its interrupted gate never reached, schema 18), P9a's Done-when 1 verified by the green two-user job, D-58 and D-59 in order. D-60 (the owner): per merge a compile and the unit's own tests; the exhaustive gates once per batch, at the end. AGENTS.md's two gate sentences, HANDOFF.md's merging procedure and the plan carry it, with the reason: five full gates around five merges took twelve hours and the one gate at the end found the same five tests. Q-9 (open, for the owner): P6's `ledger-store` -> `ledger-import` dependency, with the options and the recommendation; architecture.md marks the arrow as under review. testing.md records the merge's test changes under P6. STATUS.md gains "Now (2026-10-29)" with the gate figures (170 suites, 2,944 tests, 77 minutes), the CI state and the next steps; HANDOFF.md, roadmap.md, gui.md and the parties doc drop the paused-branch wording; README counts 129 tools and about 2,950 tests. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01HS8WZziDnyxunC23MUxrLp
This commit is contained in:
1 parent
3a1f4fd4eb
commit
bcd1048bb8
10 files changed
+152
-47
No files matched your search
@@ -4,7 +4,8 @@ Design for two features built together (the owner, 2026-10-15): a directory
|
||||
of the parties the company deals with, and attachments that link to any
|
||||
subject. Status: built (2026-10-15 to 2026-10-17: parties with roles, the
|
||||
TIN vault, attachments linked to any subject; the party's contact block,
|
||||
D-55, is built on branch S4.4 as of 2026-10-28). The design is kept as
|
||||
D-55, landed with P4b S4.4 on 2026-10-29; the same bytes filed twice are
|
||||
one attachment since P6, the same day). The design is kept as
|
||||
written; departures are in `plan/served.md` and `docs/spec/rules.md` B-26.
|
||||
|
||||
## Why together
|
||||
|
||||
Reference in new issue
Block a user