ledger-import invoice_pdf (templates/invoice.typ): seller, bill-to, number, dates, terms, lines, total, each settled line and the balance due; money formatted in Rust (the template does no arithmetic), text as data, deterministic bytes. Stamps as a rubber stamp would mark it, in red: PAID (with the day it was paid in full: the invoice is then the customer's receipt), PARTIALLY PAID, PAST DUE, VOID; DRAFT in gray for S4's preview. ledger-package invoice_document builds it from the books as of a day: the derived figures (B-38), each payment that stands on its own line with its date, payment method and reference; re-created copies say so (the issued copy is kept from S4 on and never changes). books.document pdf hands it over as a download; the viewer's invoice page saves or opens it. The owner asked for the paid stamp with the payment's date and details (2026-10-24). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01T3gXMVt7XJPi6ens1or9Dj
This commit is contained in:
12 files changed
+843
-4
No files matched your search
+9
-1
@@ -235,7 +235,15 @@ tie-out in `books.verify` and `control_problems` in `books.digest`; the
|
||||
over-the-wire test `documents_void_and_tie_out_over_the_wire`. Still for
|
||||
later slices: the processor fee on a payment (S6, with multi-document
|
||||
payments and discounts), Needs attention in the viewer for the control
|
||||
check, and S2 to S7.
|
||||
check, and S2 to S7. S2 (2026-10-24): `books.documents`,
|
||||
`books.document`, and the viewer's Invoices & Bills (Money in, Money out,
|
||||
a document's page, overview tiles). S3 (2026-10-24): the invoice PDF
|
||||
(`ledger-import` `invoice_pdf`, `templates/invoice.typ`; `ledger-package`
|
||||
`invoice_document`): re-created from the books, each payment on its own
|
||||
line with its date, method and reference, stamped PAID with the day,
|
||||
PARTIALLY PAID, PAST DUE or VOID (DRAFT, gray, for S4's preview); by
|
||||
download from `books.document pdf`, and Save invoice PDF in the viewer.
|
||||
The copy issued is kept from S4 on and never changes.
|
||||
**Still open after P3 (each for the phase named, or the lead):**
|
||||
- Invoices and bills take a project now (above), behind the new journal
|
||||
feature `document_line_projects`: the first company's books declared
|
||||
|
||||
Reference in new issue
Block a user