Commit Graph
3 Commits
Author SHA1 Message Date
swaitsandClaude Opus 5.5 321b94562a Projects: classes as entities, and the sidebar fits short windows
check / check (push) Canceled after 0s
A project is a class with facts (description, status, kind, party,
dates, links, notes) in one project.set event behind the format
feature projects. Four tools (books.add_project, update_project,
projects, project); documents and decisions link to projects; B-37:
on-spec costs are expensed as incurred, repayment is revenue, and the
unrecovered cost is never below zero (Kani). Viewer: a Projects list
and a project page with its figures, by month and by account. The
sidebar measures its footer instead of reserving a fixed 172 px.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01T3gXMVt7XJPi6ens1or9Dj
2026-10-22 03:50:52 -06:00
swaitsandClaude Opus 5.5 2f999c6050 P3: assets' posted and scheduled depreciation, their bases, and the K-1 on the tax basis (defect 13, D-41)
check / check (push) Canceled after 0s
Book value is cost less what the books posted; the schedule's figure is
apart. An asset's acquired date comes from its entry. Contributed
property keeps its section 723 carryover basis apart from its depreciable
basis (the lower of value and adjusted basis), with its 704(c) built-in
gain and method. The K-1 worksheet reports tax-basis capital (Form 1065
Item L) beside the book figures, leaving open what only the CPA knows.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01T3gXMVt7XJPi6ens1or9Dj
2026-10-21 14:04:12 -06:00
swaits 9faf3d5ca1 Initial commit: wanderbooks accounting semantics engine 2026-10-11 00:46:04 +00:00