The plan and the status documents say what is true after the merges of 2026-10-29: served.md section 0, the 8.0.1 rows and unit Status lines for S4.4, S5, S6, S7 and P6 (landed, with commits), the 8.0.2 resume paragraph turned into the record of what the merges found, P6's At-merge bullet (the write-off and dedup interaction, the five tests its interrupted gate never reached, schema 18), P9a's Done-when 1 verified by the green two-user job, D-58 and D-59 in order. D-60 (the owner): per merge a compile and the unit's own tests; the exhaustive gates once per batch, at the end. AGENTS.md's two gate sentences, HANDOFF.md's merging procedure and the plan carry it, with the reason: five full gates around five merges took twelve hours and the one gate at the end found the same five tests. Q-9 (open, for the owner): P6's `ledger-store` -> `ledger-import` dependency, with the options and the recommendation; architecture.md marks the arrow as under review. testing.md records the merge's test changes under P6. STATUS.md gains "Now (2026-10-29)" with the gate figures (170 suites, 2,944 tests, 77 minutes), the CI state and the next steps; HANDOFF.md, roadmap.md, gui.md and the parties doc drop the paused-branch wording; README counts 129 tools and about 2,950 tests. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01HS8WZziDnyxunC23MUxrLp